DeGrussa Mine Project – Flotation Column and Ancillary Items Supply and Manufacture

Scope of Works

Alltype Engineering was contracted for the supply, fabrication, testing (NDT) and surface treatment of the DeGrussa Mine flotation column which had a 4.27m diameter and was 12.52m high. Having specialist tank fabrication tooling and equipment, Alltype Engineering was able to completely manufacture and test the large column on premises and load out via the workshop overhead gantry cranes, minimising cost, complexity and risk for the tank handling prior to shipment.

Project Description

Client:

Eriez Magnetics Australia Pty Ltd

Location:

Perth, Western Australia

Year:

2017

Scope of works:

To supply, fabrication, testing (NDT) and surface treatment of the DeGrussa Mine flotation column which had a 4.27m diameter and was 12.52m high.

Can we assist you with your project or operation?

Call: +61 8 9410 5333 or email: info@alltypeengineering.com.au