Scope of Works

Alltype Engineering was contracted by Clough Suez Water Partners (CSWP) to fabricate the stainless steel pipe spools and galvanised structural supports for the Beenyup Advanced Water Recycling Plant (Stage 2) near Craigie, north of Perth.

The stainless steel pipe spools ranged in sizes from 80mm up to 1,200mm diameter, and were successfully fabricated to a high degree of accuracy in Alltype Enginnering’s dedicated stainless steel workshop, to meet the requirements of the onsite installation.

Alltype Engineering is pleased to have had the opportunity to work with CSWP on this major infrastructure development project.

Project Description

Client:

Clough Suez Water Partners

Location:

Craigie, Western Australia

Year:

2018

Scope of works:

Structural, Mechanical and Piping