Fabrication and Installation of Highway Overhead Gantry Structures

Scope of Works

Alltype Engineering was contracted to supply, fabricate and install the overhead sign and traffic management gantry structures for the Northlink Stage 1 highway upgrade near the Perth International Airport.

The gantries and signage frames, up to 30m in length, were shop assembled to maximise off site works and delivered using dedicated vehicle escorts, complete with two trestle legs for each gantry unit.

The installation of the gantry frame assemblies was subsequently undertaken in shutdown conditions, maximising traffic management directives of Main Roads WA.

Project Description

Client:

Gateway WA (Perth Airport and Freight Access Project)

Location:

Perth WA

Year:

2017

Scope of works:

To supply, fabricate and install the overhead sign and traffic management gantry structures for the Northlink Stage 1 highway upgrade near the Perth International Airport.