NEWS

Alltype Engineering News

News and Insights.

Awarded Project - WA Kalbarri National Park Skywalk

December 2018

Based on proven expertise and experience, Alltype Engineering has been appointed to supply, fabricate and assemble the cantilevered walkways for the upcoming Kalbarri National Park Skywalk.

The skywalk will be projected beyond the Murchison Gorge rim at an elevation of more than 100 metres above the Murchison River and extend 25 metres from the cliff edge.

Tianqi Lithium Plant Being Built By MSP Engineering In Kwinana

November 2018

What an impressive sight!

Tank number 55 of 65 heads down Hope Valley Road out of our workshop towards the Tianqi Lithium plant being built by MSP Engineering in Kwinana.

Alltype Engineering has one of the largest dedicated stainless steel tank and vessel fabrication workshops in the country – which we needed to run like an assembly line to meet the delivery schedule. Great work team.

Kwinana Industrial Strip Set To Become Epicentre Of Booming Lithium Supply Market

November 2018

Alltype Engineering was contracted to deliver detailing, fabrication, testing and supply of stainless steel (Lean and Super Duplex) tanks and all associated complete with external insulation to the majority of the tanks. Tanks ranged from 2.5-7.1m diameter and 3.8-8.3m in height.

Having specialist tank fabrication tooling and equipment, Alltype Engineering was able to completely manufacture and test the tanks on our premises and load out via the workshop overhead gantry cranes, minimising cost, complexity and risk for the tank handling prior to shipment.

Read more

APA Group Murrin Delivery Station Project

October 2018

Alltype Engineering is pleased to advise that we have been awarded the Murrin Delivery Station project from APA Group. Alltype Engineering recently completed the Murrin Offtake Station (MOS) civil, structural, mechanical, piping and electrical and instrumentation works for APA Group.

This project was completed in August 2018 by Alltype Engineering’s multidisciplinary project team for APA Group, following the previous success of the Wiluna Control Systems upgrade project undertaken by our E&I team.

By utilising self-execution for the majority of the supply chain including workshop and site scopes, there were significant reductions of interface risk which was critical to success on this tight schedule project. This same approach previously allowed us to deliver a turnkey compressor station project on a fast tracked basis in the first half of 2018.

50th Annual APGA Conference and Exhibition

September 2018

Alltype Engineering recently attended the 50th annual Australian Pipelines and Gas Association (APGA) Conference and Exhibition which was held in Darwin between 8th and 11th September. This major annual industry event provides excellent information and extensive networking opportunities.

If you get the chance to read the latest copy of The Australian Pipeliner magazine, there is a great article about us on page 106-107.

Read More

News archive

Can we assist you with your project or operation?

Call: +61 8 9410 5333 or email: info@alltypeengineering.com.au